
Beyond Evolution
A downloadable game for Windows, macOS, Linux, and Android
Download NowName your own price
Grow muscle. Prevail against the invasion.
[ CONTENT WARNING: Contains explicit adult & futanari themes ]
About the Game
Beyond Evolution is a Turn based Gacha game where you play as a young scientist, who is gathering muscular warriors to make an army to stop the demon invasion.
Key Features
- Recruitment & Gacha Roster: Unlock, rank up, and evolve a growing lineup of muscular warriors, girls, and futas with distinct combat profiles.
- Turn based combat: Enjoy a diverse and unique turn based combat style
- Tons of Characters: New characters will come often
- Partial non-futa mode: Most futa related content can be slightly suppressed to not show
- 15,000 lines of dialogue: Interact with characters to see short stories about them and maybe even some spicy interactions as you build a bond with them!
Development Status
Beyond Evolution is in active, ongoing development. We regularly release new playable units, expanded story stages, balance adjustments, and UI enhancements. Check the Devlog below for the latest patch notes and bugfixes.
We read every comment—drop your feedback, bug reports, and character suggestions down below!
Credits
- Code & Design: Faustto
- Art: Faustto
- Writting: Robomuffin, D/D/DANTZ
- Playtester: VIPERBYTE_GLHF
Follow the Development: Patreon | Discord | DeviantArt | Website
| Updated | 11 days ago |
| Status | In development |
| Platforms | Windows, macOS, Linux, Android |
| Rating | Rated 4.2 out of 5 stars (17 total ratings) |
| Author | Faustto |
| Genre | Role Playing |
| Made with | Godot |
| Tags | fmg, futanari, Gacha, growth, muscle |
| Code license | MIT License |
| Average session | About an hour |
| Languages | English |
| Inputs | Keyboard, Touchscreen |
| AI Disclosure | AI Assisted, Graphics |
Download
Download NowName your own price
Click download now to get access to the following files:
Windows 449 MB
Linux 450 MB
Mac 476 MB
Android 566 MB
Development log
- Version 1.2.111 days ago
- Bugfixes v1.233 days ago
- Version 1.235 days ago
- Bugfixes v1.1.576 days ago
- Version 1.1.577 days ago
- Looking for a WriterJun 06, 2026
- Bugfixes v1.1Apr 21, 2026
- Version 1.1Apr 20, 2026







Comments
Log in with itch.io to leave a comment.
Fun game. Now to wait for more story and more girls.
Twelve wolves is way too many for what I assume is an early farming stage.
Wolves are a very weak enemy so most teams can very easily clear it. Also its not meant to be cleared instantly after unlocked so if you haven't, just progress a few stages and you'll be able to do it.
Ah. Gotcha.
I don’t understand the vibe of gacha games. But I know for sure that their foundation is solid and enjoyable gameplay. In my opinion, the jrpg component in this project is poorly executed. The battles are routine and monotonous. In a fetish game, I’d prefer to see full‑fledged art of girls and monsters during combat, rather than their chibi versions. I think the attacks and abilities need more impact, and all the fighters on the field need fewer HP. There is a lack of control and variability in leveling up the heroines. And I’m not talking about visual diversity, but about managing their stats. This is not just about choosing your own gameplay style, but about the possibility of creating an emotional connection with the character. I also consider the absence of exploration elements to be a serious oversight. No good JRPG, starting from the very oldest ones, has ever allowed itself to do something like this.
Despite all of the above, I respect the game’s author and really appreciate his two previous projects (it’s a pity that neither of them reached a completed state). And I consider his art to be among the best in the entire FMG community. I’m impressed by how much the latest project has progressed since the first version was made available to the public. I’ll continue to follow it and I’m sure it will evolve into one of the best FMG games!
The game isn't really supposed to be a JRPG, but it can be seen as such I guess. I'd say what you feel is relevant and I know that the gameplay is not perfect, but I am a solo developer so I can't just implement all the systems needed for it to feel complete and good.
The artwork style, while not ideal, I'd say works better than just showing their full portraits. Due to how I've designed combat to be based around the position of a character on the field, it would be difficult to make the full portraits have good visibility. You can already see them on the side.
I know currently combat feels a bit sluggish due to the larger than usual HP pools, but that is intentional in the sense that I have plans on reducing the amount of times you need to play the same stages.
For stats, I don't want to give freedom to players with stuff like items and any sort of powerups. I have three reasons for that. First, it doesn't really make sense lore wise. Second, it is not in the ability design philosophy I have. Third, I want to give the vision of the character I have with their given stats. While it would probably be fun to customize them in some way, I do think its going to be a hindrance in the long run. At least if its done in a very freeing way. I am not saying that there won't be another power up mechanic in the game, but it just won't be very free for you to customize.
Exploration isn't really a gameplay focus of this game and I don't see why it should be. As I said, I don't focus to make a JRPG - just a game with a gacha system for collecting lots of muscular girls.
I know it is a shame to see my past two games not being actively developed. Expanding Horizons just got too complicated to develop as I was a novice programmer and the spaghetti code just piled on and on. As for Growing Explorations, I still intend to do one final update to finish it off. Don't know when that will be
I am glad you like the game and I am very happy you enjoy the art! Takes quite a bit of time to make it. This project will continue to progress, but be on the lookout of something new incoming too in the (hopefully) not too distant future. (Doesn't mean this game will be deprecated though)
I really appreciate your comment and all the feedback you've given! I'll for sure make use of it when developing the game! Thank you!
Sorry if it has been suggested already but have you thought about adding a bad ending cutscene to some of the main bosses like xaraziel if you lose to them? like a what if they won and maybe they get to grow and all that
Well bad scenes wouldn't really make sense as you techically don't loose to them. The game follows a linear story so such branches don't work for it.
Yeah but I mean as just a something extra before the game over screen, something like the mid battle cutscene where they grow. No need to change the story just a small cutscene showing them win and maybe grow a bit more and then cut to the game over screen.
Yeah I understand what you mean and no, it won't ever come. This doesn't comply with the rules I have for the main storyline. Also the bosses growing further just for a scene like that won't happen even if something like this is added (it won't be).
Ok I figured I would shoot my shot just in case. The game is great, keep up the good work
Suggestions are always welcome! I am sorry it won't work out but still thank you for suggesting!
Would it be possible to grant every character a second opportunity for growth, and Hyper‑type characters an additional third chance? I wonder if this could be implemented. After all, the other character are equally endearing.
Sadly no. It would just add too much extra to be made for each character. Only Hyper and Prime characters will grow, with a few exceptions though - some Ultras will get an "alternate" image for their grown stage.
Alright, even though there are some disappointments, thank you for getting back to me. I’m also grateful for everything you’ve contributed to the FMG community. Wishing the game all the best going forward!
I am sorry to disappoint! It has been asked by a lot of people but it sadly won't be possible to have.
Thank you for the kind words and I will strive to improve the game further in the future! Stay tuned!
Amazing game, I can't wait for more massively powerfull girl
Thank you, glad to hear you like it! More big girls are coming!
To the Second Growth, what characters can do it in this versión and how i use it? I have Nady
All Hyper characters + Narrator-chan who is the patreon exclusive character. In general all Hypers and Primes will be able to do it. Currently Tio doesn't as she doesn't have her potentials, which will be gained in the story as it progresses and at some point you will see her grow too.
There are diffferent conditions to each growth though, so you should read their passives to find that out.
Is there some kind of guide available? Having a really hard time beating level 1-12. Got a party of level 40s and am getting smoked every time I try it. But I can't get any hearts if I can't beat this level, so this is as far as I can level my girls. I guess the party makeup may not be good, but clearly I'm having a hard time figuring out which classes are best to use.
That stage has been difficult for some people in the past too, but has been repeatedly and heavily nerfed to be much easier. You should be able to clear it easily with a team with characters like Maria, Valerie, Laura, Camila, Tio and whoever else you may like. You just need strong DPS characters and you're good.
I tried a party of Tio, Valerie, Laura, Camila, Braga, and Helena (I don't have Maria). No luck. I can't outpace the damage they do and I can't even make a dent in Xazariel's health. She and that overpowered nun just fry my team.
It is indeed hard to do it with this team, though I did it after a few manual tries, just focusing the demonlings with the melee units while the others focus on the nun, then start going after Xazariel.
For the easiest clear I recommend you just pull maria and make her level 40.
Also as I see you are commenting on the 1.1.5 version post? The enemies in the stage as a whole were quite heavily nerfed in 1.2.0, so if you are on the older version you should try the update.
I don't know why it shows I'm commenting on 1.1.5, because I am playing 1.2.
Does Maria have a extremely low drop rate? Because she is just not showing up in any of my pulls.
If I can't get Maria, is there another party combo you could suggest?
You have a counter until you hit the next Hyper character above the recruit button. If you want to get specifically her, then recruit on the second banner by pressing the arrow on the right of the screen when you open the recruitment menu.
As for a combo, you can use Tio + Vionne, as thats quite a strong one. Another character that might be useful is Irina as she can target the Nun. If you pulled Nady instead of Maria, she is quite strong too, so you can also use her too.
I have all these characters at level 40, I attack the nun first and prioritise the demonlings with melee units and STILL can't beat this level. My version of the game is 1.2.1
You should be able to pretty easily beat it. They were even further nerfed in the latest version so it shouldn't really matter who you use for that if you have any solid DPS unit. Tell me what your team is and I might be able to guide you a bit.
Thanks for replying. My team is: Maria, Valerie, Laura, Camila, Tio and Vionne.
Its a pretty strong team so I don't know how you are not clearing it.
Well the backup save thing is pretty much useless on mobile because save files are stored in a folder that you cant access without root access. Great.
Well saving on Android has been broken since the launch of the game. I have been searching for a solution for this, but haven't found one yet.
hey i have trouble with the authentication its doesn't work to me
Have you logged into your Patreon account on your browser? As sometimes if you aren't and log in on the spot it doesn't authenticate as it expires.
i did but still doesn't work its take long time to reload but uts say failed
I assume you are on android as it is the platform with most such issues. If you are you should just switch back to the game after the page freezes after you press allow and it should work.
ok can you fix it after new update? so its will be fine?
Is usually works, so I won't be touching it anytime soon. You should follow the steps I told you if you are on Android:
Open the game -> Click 'Authenticate' -> In the webpage click 'Allow' -> Switch back to the game even if the page doesn't load further
If you are on any other platform (Windows, Mac, Linux), you will need to tell me what you do and what exactly happens, as it hasn't been reported that it doesn't work there.
where do i find the 2nd boss?
She is on the last stage currently available: 1-26
yep, i was stuck a bit on a level and it wound't progress, after closing and opening it did.
Love the new characters.
futa superiority
The first ever fmg gasha game . Say wallahi
If you skip the intro, Tio is never added to your roster, and you can't complete the tutorial.
You shouldn't be able to skip the intro.
Hi Faustto. Question: I'm seemingly stuck at the R-1 12 wolves stage. I have a full party of level 40 characters and don't have an option to advance beyond the stage. Any advice would be appreciated, thanks!
R-1 doesn't progress the story. You should play the other stages that are connected with lines to progress onward.
Oh I must have been distracted by 12 wolves vs 5. Thanks!
No problem
Is there a place where I can find info? for example, where does the current version of the game finish? I am at stage 1- 20 from the sloth campaign and I cannot keep advancing, is that intended? Also, I got a stage 2 growth image for Maria, but no growth scene, is this normal? Finally, how do you get the character narrator-chan?
Currently there are no guides.
The last stage is 1-20, you should have seen a message at the end of story singaling that
All characters who have 2nd stages get them only during combat. They don't have a dedicated scene to it. Though Maria does grow during her Bond dialogue.
Narrator-chan is Patreon exclusive. You need to be of the Growth Connoisseur tier on my patreon then authenticate inside the game. She will appear as an item inside your inventory if you do that.
heyya, got a problem with this new patch where it say "unable to setup godot engine, abort..". any ways of fixing that? btw, i was on the android vers.
Android seems to be currently bugged. I will fix it later when I am free. Sorry for the inconvenience!
is fine, take your time with it... lookin forward to play this new vers🙌🏻🙌🏻🙌🏻
I released a bugfix version a bit ago, but sadly the android version is still not fixed, as I couldn't find out why it is like this.
hope you can find the problem soon🙏🏼🙏🏼🙏🏼
The issue has been fixed. You should be able to play it on android now. Sorry for the inconvenience!
Hello, I have a problem. I want to authenticate my account in the game on my phone, but for some reason, when I click on "Accept" in the authentication window, it keeps loading forever.
That is normal on android. You just need to switch back to the game and you'll have been authenticated.
doest work
This is my favorite game on the site and my favorite NSFW game. I made an account just to say you did an amazing job. I love the premise, the story, the artistic direction, and the gameplay.
I did encounter some glitches.
1. After beating all the content, I created a new save file. Everyone was leveled up and evolved immediately after recruitment, which doesn't seem intended.
2. After a few gacha spins / combat stages on the new save, my old save files were gone. Autosave seems to overwrite prior saves without warning. Thankfully I had a backup. I still don't understand how the autosave works.
3. When hovering over actives / passives in combat, sometimes the text box goes off screen. Jiggling the mouse fixes it, but the initial behavior is unexpected.
4. Sometimes the tutorial does not play on new saves. Sometimes I can exit mid-tutorial and get a freebie gacha spin on another save. Difficult to reproduce.
5. I kept trying to toggle a setting (futa off) but it would not persist on reload.
6. Sometimes the number keys don't work and I have to click the squares to use active skills.
7. As others have mentioned, it's impossible to press the button to return to the map when more than 10 items are dropped.
I also found some features of the GUI confusing.
1. The settings button is top-left on the main menu but shifted right (displaced by back button) on the lab page. Even now it confuses my muscle memory.
2. When first loading the game, I expected the play button to send me straight in, like Dark Souls. It took me some time to figure out that I had to make an empty save file.
3. Crafting is tedious. It takes 6+ clicks to go from the ascension page to the crafted item (since I had to match the required item to the recipes). Then another 7+ clicks to complete the upgrade. It could be reduced from 13+ clicks to 2 clicks by allowing ascension to consume the recipe ingredients directly with a confirmation screen.
4. I wish there was a button that upgraded as many levels as you can afford. It would also be nice to see how an upgrade would affect the stats before purchasing it (like Dark Souls).
5. The "ascension confirmation when you don't have the heart" modal has a really small exit button. It also disables the back button. I would prefer to either leave the back button enabled or close the modal on any user input since there is no other action that can be performed. Or directly replace the blue heart with an image of the required heart.
6. For personal information / backstory / bond, I think switching between browser-esque tabs would be more suitable than the dropdown menus.
7. Some of the levels (especially R-1) take a long time for the enemies to show up.
8. I wish it was possible to skip the "name / class / potential" gacha screen.
9. The arrow buttons on the sin selection screen (sloth, deceit, envy, etc.) are quite small. I would prefer if clicking anywhere left / right of the selected sin had the same effect. Or do it like Shadow Fight 2 and combine the sin selection screen + map selection screen.
Otherwise, I think the game was exceptionally well done. I look forward to future content. I even managed to beat all the levels with Tio and only 2 summons (Vionne and Maria). Basically Pucci, Dio, and Kars from JJBA, haha.
Glad you liked the game and thanks for the comprehensive review!
I will now proceed to answer your points:
1. I will look into it, hasn't been reported before, but I think I may know how it happens
2. The main save is replaced by the one you played most recently. Autosaves are created when a update action has happened - like getting a new character, leveling someone up, using an item etc. Also when you go back to main menu, an autosave is made immediately
3. This is a known bug, but it is sadly due to an external addon I use for tooltips, thus not much I can do about it currently, it just works like that. I will someday write my own tooltips so that doesn't happen, but can't say when exactly
4. I will look into this, in general the tutorial hasn't been tested very much so that is to be expected I guess
5. It should presist, just tested it. This might be something related to switching saves, as the settings are kept within saves
6. There are certain skills that can't be used with keys
7. This has been fixed in the developer version so will come with next update
1. Some such inconsistencies have been fixed in the dev version
2. The GUI in general is not at all polished, things like easier understanding of the UI will come as the game matures (I am a single dev after all and not a professional in UI design in the slightest)
3. I was thinking of doing something about that, I may just make it so you are just taken to the crafting menu instead. There will be changes to how the UI in the character screen feels and looks sooner or later as its quite bad right now, thus that will be fixed along with this
4. You just need to drag the slider to the end to do that. It scales based on the maximum amount of levels you can put in.
5. There is in the dev version
6. This will be addressed in the character menu overhaul
7. What do you mean? All enemies should spawn out instantly after the initial darkened screen
8. I wish you could too... Jokes aside, it is not skippable because I kind of rushed its implementation. It is in the dev version
9. You can switch between them in a couple of ways: drag with the mouse (finger if you are on mobile), scroll wheel or keyboard arrows
Yeah the game is pretty easy to beat currently, but stages will get harder as the story progresses and enemy levels rise.
Hope I clarified some of your points and again, I am thankful for the review!
Yeah I think you covered everything, appreciate the explanations. I think autosave is fine as a default but would appreciate a setting to turn it off.
For glitch #5, I completed the tutorial from a fresh install, went to main menu, turned off the setting, overwrote all saves, and reloaded. Setting is back on.
For UI #7, it was fixed after restarting the game. If you enter R-1, beat the level, and enter it again, the enemies spawn further and further to the right each time. It takes longer for them to jostle into position. Easiest way to see is to enter R-1, run away, rinse and repeat. It doesn't seem to be an issue on other levels.
Overall, I think the enemy positions could be clarified. Maybe shift the summons further to the left and organize the enemies into columns. For example, in R-1 you could have 4 columns of 3 wolves.
For the overall mechanics, I think you did a great job. Hence the comparisons to Dark Souls.
Autosave is mostly on because if it wasn't you won't get any progress saved unless you do it manually, which is why I don't give an option for that.
5. You may have overridden the save where the settings were updated
7. Okay, I will look into it
Again thanks for the kind words! Glad you enjoyed! Look forward to an update soon!
Hello. I have been enjoying the game so far and its been enjoyable to figure out character combinations. What I have been strugggling to find out though is how and when secondary growth is triggered. What is also unclear whether or not Story-Endings are affected by affection or not. Since for Aiko the Ending stays the same regardless whether she "enjoys the MCs company" or doesn´t. Some clarity would be great since there is no UI that indicated if answers are "correct" or not.
Most of your questions are answered in the info button inside the character screen.
Second growth is triggered only for 2 characters currently: Maria and Narrator-chan. It happens when they have 200 resonance and are already grown once. Then you will have to look through their passives and the condition will be written there.
Bond endings are indeed affected by choices. There are 6 states of affection and each 2 trigger a different ending. You can also go back and replay a certain episode in order to change your choice.
A little tip, choices are like this ALWAYS: top is bad, middle is neutral and botton is good. This is to make it easier to reach all endings. Also choices have some differenced for following dialogue too.
Hope this answers your questions!
This does answer most of my questions. Thank you. In case of Maria the bond quality did not refresh after redoing the choices until I replayed the first interaction. I also found Marias Secondary Growth Condition by chance shortly after writing my initial comment. Just need to unlock Narrator Chan still and see how it turns out there (last one I haven´t unlocked). Thank you for your detailed response.
You can't unlock Narrator-chan unless you have a Patreon membership. She is for supporters only.
How do I unlock the deceit level?
You can't as its not out yet and won't be anytime soon as there are still stages for Sloth to be added
i have marie in my group but is it any tips which i would bring other in group as i used maria, layla, tio and Valerie but two missed what would good combo in there for to goal beat the nun boss.
You can get Nyxra and maybe even Laura in the team and it should be quite fine to do.
I like the game but nuns are OP. Even with a full level 40 party with some 90 (Vionne, Layla, Marcille), I can't deal more damage than what they heal. Looking at base stats I should be able to kill them. I do not understand. Something is not working properly.
I'm talking about the mission where you have 10% to get a heart.
Well they are not that hard if you use Maria. I've nerfed them a few times already, but they will be nerfed again soon too, as a lot of people are having difficulties with them.
Maria level 40 with her boost active deals between 2 to 4 %of her HP, sometimes a bit more
Hmm, thats weird. When I use her she deals like 20-30% when they have a brand on them
I loved the game, Tio best girl
As an android user when I updated to the new version my old progress didn't transfer to the new version. I checked the saves but I couldn't find it there.
Android saves are quite weird, because if you don't allow it to save, then it won't, so it might be sadly lost.
If you get more than 10 items on a level, like on a 10x sweep of R-3, the button to continue is pushed off screen and there's no way to trigger it (I tried just about every key on my keyboard, but it seems you really need to click it). I had to close the game to progress - thankfully it did update the save so when I loaded back in, the items were in my inventory.
Okay, I will look into this. It should just be an oversight on my side.
I don't know how you can't kill the nuns. Usually if you target them specifically they die quite easily if you have strong enough characters. Like level 40s work. The easiest option is Maria, because she can basically 2 hit them if she has her passive active.
Having problems saving. I think I read somwhere that it saves outomaticly but it does not for me :/
What platform are you on? Because if you are on android, it doesn't save if you deny its saving permissions. On windows it should save normally.
I am on windows. Should there be a file or something somwhere? The only thing that I have is the exe file and that is it.
Saves are kept in %appdata%/Godot/app_userdata/beyond-evolution/
Mac version works! Thank you!
Glad to hear it! Was a pain to get it working but thankfully it really does.
hey faustto, i need to ask where i can buy the beyond evolution version 1.0 ?
The game is completely free, but if you want a boost on progression you can subscribe to my Patreon. You can find the link in the game bio here, as itch.io doesn't let me paste links in comments.
thank you I will maybe subscribe soon and your game is so amazing and legendary
Thank you for the kind words! There is gonna be an update soon so don't miss out!
我想问一下,在欧洲地区完成1-12级后,这些关卡就不再解锁了。即使我完成了几个地下城关卡,它依然不起作用。发生什么事了?
From what I can understand you have reached stage 1-12. You can't progress further because that is the last stage for he current version.
A character has to reach level 40 and have 100 resonance which is gained from combat. Then you have to make a Refined Heart with a specific compound. These items are farmable in the R stages. Every character needs a different one and it will be shown which one that is when you try to ascend them before having the item.
idk if it's me or not, the game just opens a black window and then crashes. Did I do something wrong with the zip file?
What platform are you on? If its mac, thats normal. Otherwise, it shouldn't do that, I haven't heard anyone have this issue. Can you tell me more how it happens? Does it just instantly close
i'm on Windows, I click on the exe, a black screened window appears, but after a few seconds the window closes itself
I just downloaded the file and extracted it, nothing more
Tried it on mobile and it works perfectly
Thats very strange. Did you try redownloading it again? If that too doesn't help can you send be the logs? They are located on %appdata%/Godot/app_userdata/beyond-evolution
I've been enjoying the game a lot so far and it's nice there are stages to farm specific items and being able to got multiple clears in a single battle. The difficulty has been rather challenging especially the nuns. I'm not sure if I'm on the current version but I've been experiencing realtively frequent crashes and after the latest one all my data seems to have been wiped. Also I haven't tried every character yet but Maria just seems much stronger than others.
Edit: I was not on the newest version also I wanted to ask how taunting works. I'm not sure it's working properly or not.
Glad you have enjoyed the game so far! Most game crashes have been fixed now but saving still has issues. They have been fixed for the next version so lets hope its more bug prone.
As for Maria, she is supposed to be the strongest of the starting cast as she is incredibly rare compared to the rest so thats normal.
Taunt basically just increases the chance to be targeted. There was an issue previously with the sorting function used for it so it might have not worked in more bizzare cases. It should be fixed in the latest current release though. It has been also improved as well as targeting in general for the next version.
Thank you very much for replying. That Maria is the strongest because she is very rare is reasonable. I just wanted to mention it because of future updates. I don't know if you plan to decrease the difficulty of what is in the current version as more content is added or want to keep it at this difficulty. It's that she is so strong that she solos everything right now.
I don't understand how saving works. If I understand correctly progress is being saved when closing the game. But when I reopen and then try to start the game I'm being asked to create a profile.
Note: I always exit from the title screen.
For the difficulty, I think most people complain about the nuns' healing. It has been nerfed significantly for the next version.
Overall, as more stages get released the resource stages will get more spread out, thus making it possible to reduce their difficulty. As it currently is, I had to somehow make the "endgame" of the current version somewhat challenging, thus the power of enemies.
Saving is done every 5 seconds in the background. It also saves upon game close. So when a crash happens at the perfect time, aka when the game was saving, it corrupts the files. I have fixed this problem for the next version so it will be better for sure.
Please create a guide on how to trigger in-game saving. Re-grinding is an off-putting experience.
In-game saving is triggered every 5 seconds. If you are on android it might not work at all, because of permissions.
I was playing on Windows.
The problem with the present approach is, it is not mentioned when the back-up save is being triggered. Therefore, as long as the most current savefile is not reliably stored, poor players like myself will have to keep re-grinding (and this game is already quite grindy). If your aim is to prevent gamers from savefile cheats, please also consider the overall stability and weigh the relative game design importance.
This game has potential, but it also needs to be save-able. I suggest either 1) Create a separate hardcore mode which does not allow discretionary saving, or; 2) Autosave at the end of a battle/before the start of a battle + roll over the previous save to the back-up slots
Backup saves are created at the same time as normal saves. Currently the issue stems from crashes that happen during the saving action. I have made it more stable and it will only get better. This is only the first version after all.
To explain a bit more of the saving system, it currently stages changed and commits them to the save file only every 5 seconds or on important events such as winning a stage, recruiting a character from the banner and leveling up a character.
Savefile cheating is not a concern currently and won't be. The files are encrypted by default but that is not a measure made because of this.
I am sorry for your bad experience, but I hope to do better in next releases. The saving system has been a problem since release and with this being the first official version, it is normal to have bugs.
Im sorry but the nun fight is absolute fucking garbage.
No matter what i try, my full level 40 team cant do shit. She keeps healing and healing while slowly killing my team, constantly. Fuck this fight.
Well its not that hard as you can grow 2-3 characters before it. If you do that it will be very easy - just kill the nuns. They are going to get nerfed in the next update so it will be much easier then.
I made it that hard as with it you kind of enter the 'endgame' of the current version, so it can't be so easy.
It's not that hard. Freeze the nun with one of the characters.
I tried downloading the game through the Itch.io app and the tutorial is bugged as I am softlocked from progressing. I do not see the stage at all, and I see a blank area with an island to the side. I even tried to uninstall and reinstall and the issue was not fixe
Are you on an older device perhaps? The current rendering library I use is incompatible with older hardware, so that might be the issue.
The laptop is 6 years old. It can handle ark survival evolved with low settings. I'm not sure if it is due to hardware then
It depends on a few things, but you can search up Vulcan compatibility online and there is a tool that can tell you if its due to that. This issue is only caused by this.
Ah ok, I'll double check it. Last time I checked, my laptop could play Valheim through Vulkan. Things might've changed then.
I know that the newer versions of Vulkan, I think it was from 1.3, have more compatibility issues with older hardware. It may also be a gpu driver issue if you are on 5th or 6th gen nvidia.
Is Mac working yet
Not yet
Do you know if/when it will be fixed?
Can't really say, as I am having difficulties exporting mac templates currently, as I use a custom version of godot engine
This game needs either to be less tedious or have cheats for high tier patreon subscribers. Way too grindy.
High tier patreon subscribers have resource multipliers. The grind itself will get easier with updates as currently the stages are too focused. Also with the Auto + x4 buttons it is quite fast to grind resources I'd say, unlike how it was on release.
game does not save for me, crashed and i lost all progress.every time i close i have to start over..
Are you on mobile? If so, then it is due to the game not saving properly on android be default. You can enable it to save by giving it file access permissions in the settings of the app.
Also how did the crash happen?
it was on windows, game stuttered for a second then closed itself
also idk, i create a profile, then, i have to click the arrow back top left and then it will only start for me, but every time i close the game everything is gone
Hmm, this hasn't happened to anyone before.
Are you on the newest version?
When creating a profile, you just need to enter a username and click create then click back on the account menu. It will take you to the start screen and you should be able to play.
Also what were you doing when the crash happened?
thats exactly how i did it, multiple times, still won‘t save, i am on the newesr version yes
It crashed twice, i think pnce during skipping dialouge and once right after in the tut fight when i was about to attack, sadly i can‘t provide any logs and it wouldn‘t be as bad if the game would just save :/
Did you check if there are backup saves? Or is there just nothing?
feel like a moron but how do I load player data on android? closed the app and reopened it and I don't see where I load the saved data
There are issues with saving on mobile currently. It will be fixed next update.